How a major project reduced cost by 60% in 10 weeks

Enjoy this short video covering how a major project team reduced their costs by more than 60% in 10 weeks using Zero-Based Analysis and Variable Analysis:

Stroud International

Stroud is a professional services firm that specializes in driving breakthrough improvement in operations and capital projects since 2001. Stroud operates globally through its Boston (US), London (UK), and Calgary (Canada) offices and is able to provide services in English, German, Spanish, French, and has significant capability in other European languages.

https://ca.linkedin.com/company/stroud-international
Next
Next

Solving a Food Manufacturer’s Critical Problem